Watershed-Mmabatho 88kV Power Line

 

Arcus GIBB was appointed by Eskom Holdings Limited – Distribution Division (Eskom) to undertake a Basic Assessment and the Public Participation Process (PPP) for the proposed construction of an 88 kV power line from Watershed Distribution Substation (DS) near Lichtenburg, to Mmabatho Bulk Substation (a Major Transmission Station (MTS)) near Mmabatho and Mafikeng, in the North West Province. The proposed power line will be supplied from the old 88kV Zeerust feeder bay at the Watershed DS and will pass through various properties from Lichtenburg to the Mmabatho Area, along the same route as the existing direct Watershed-Mmabatho line – approximately a 60km distance. A new 88kV feeder bay will be constructed and an 88/88 kV 120 MVA booster will be installed, both at the Mmabatho Bulk Substation.
 
Arcus GIBB compiled the Draft Basic Assessment Report (BAR) and distributed it for public comment on 13 February 2009. The public commenting period concluded on 16 March 2009. Subsequent to this, the Department of Environmental Affairs (DEA) requested amendments to the report and required that the report be provided for a second round of comments by interested and affected parties. The purpose of these amendments is to consider alternative alignments that were included in the initial Scoping Report in terms of the ECA. The revised report was accordingly provided for a 14 day comment period as agreed with DEAT (from Monday, 20 July 2009 to Monday, 3 August 2009).
 
All comments received during circulation of the Draft Basic Assessment Report and Revised Basic Assessment Report have been incorporated and addressed in an Issues and Response Report (appended to the Final Revised Basic Assessment Report (FRBAR)). The FRBAR was submitted to the relevant authority, the Department of Environmental Affairs (DEA), for their consideration on the 7 August 2009 and has been made available on this website.
 
Arcus GIBB would like to express our sincere thanks for your involvement on this project. We are grateful for all comments received.

Contact Details:
Fiona Grimett Tel:                             (011) 519 4600
ARCUS GIBB (Pty) Ltd                      Fax:      (011) 807 5670
PO Box 2700, Rivonia, 2128           E-mail:  fgrimett@gibb.co.za
 
 
 

 Documents available for download
 TitleDescriptionSize 
Watershed-MmabathoFinal Revised Basic Assessment Report892.44 KBDownload
Appendix A1Route Alignment Plan2.66 MBDownload
Appendix A2Land Cover Map234.26 KBDownload
Appendix A3Heritage Features on the Site214.09 KBDownload
Appendix A4Route Alignment Co-ordinates36.82 KBDownload
Appendix B1Map showing positions from where site photographs where taken1.03 MBDownload
Appendix B2Site Photographs2.02 MBDownload
Appendix CFacility Illustration (technical drawing of the pole structures)40.49 KBDownload
Appendix D1Biodiversity Impact Assessment Report3.46 MBDownload
Appendix D2Heritage Impact Assessment Report3.28 MBDownload
Appendix D3Visual Impact Assessment Report4.94 MBDownload
Appendix D4Avifaunal Impact Assessment Report2.49 MBDownload
Appendix EComment and Response Report66.28 KBDownload
Appendix F1Rejection letter from DEAT144.00 KBDownload
Appendix F2SAHRA Review Comment238.16 KBDownload
Appendix F3Advertisement and Site Notices1.63 MBDownload
Appendix F4I&AP Correspondence12.52 MBDownload
Appendix F5Stakeholder Database37.13 KBDownload
Appendix F6Background Information Document (BID) and Registration and Comment Form 5.67 MBDownload
Appendix F7Payment for Servitudes Acquired270.48 KBDownload
Appendix F8Draft Environmental Management Plan 354.56 KBDownload
Appendix G1Previous ECA Record of Decision from NWDACE601.10 KBDownload
Appendix G2Previous Scoping Report17.79 MBDownload
   
  Login