New 132 kV overhead transmission powerlines are proposed to strengthen and upgrade the grid supply in the Patensie, Humansdorp and Kareedouw area, Eastern Cape, in order to support the recent and planned growth and development in the area.

 

An upgrade of the existing electrical distribution network is therefore required to accommodate the new supply. This involves the construction of new 132 kV infrastructure, new substations as well as the decommissioning of certain facilities. The construction of new and upgrading of existing substations will further aid in strengthening of the local network.  The total length of the proposed powerlines amounts to approximately 90 km.
 

 
 
 

Melkhout to Dieprivier, Cacadu District (this project)

Melkhout to Patensie, Cacadu District

Dieprivier to Kareedouw, Cacadu District

 
 Any comments on the final BAR are to be submitted directly to the DEA case officer listed at the following address:


Postal address:
Ms Toinette van der Merwe
Department of Environmental Affairs
Integrated Environmental Authorisations
Private Bag X 447
Pretoria
0001


Street address:
Fedsure Building
315 Pretorius Street
Pretoria


Please provide the application reference number as follows: 
NEAS Ref: DEA/EIA/0001211/2012
DEA Ref: 14/12/16/3/3/1/572


Please submit your comments to the DEA within 21 days of the date of this notice:
Date of Notice: 22 November 2012



 

 Final Basic Assessment
 TitleDescriptionSize 
Final Basic Assessment ReportFinal Basic Assessment Report1.66 MBDownload
Appendices coverAppendices content page1.66 MBDownload
Appendix ASensitivity, site and route layout maps979.01 KBDownload
Appendix BPhotographs413.14 KBDownload
Appendix CFacility illustrations636.60 KBDownload
Appendix D1Avifauna Assessment Report889.22 KBDownload
Appendix D2Vegetation Assessment Report8.87 MBDownload
Appendix D3Heritage Assessment Report816.70 KBDownload
Appendix D4Wetland Assessment Report1.74 MBDownload
Appendix E PPP and CRR10.39 MBDownload
Appendix E2. Response to ECHPRA196.70 KBDownload
Appendix FDetailed Impact Assessment540.26 KBDownload
Appendix GEAP declaration of interest and expertise838.93 KBDownload
Appendix HEAP declaration of interest and expertise384.79 KBDownload
Appendix ISpecialists' declaration of interest676.20 KBDownload
   
  Login